Delivery with check measurement

What the journey looks like when we carry out a check measurement before we make your worktop. See the timeline, the preparations and what you approve at each step.

Three things to know up front. The base units must be installed and plumb and level before the measurement. We measure, position the sink and hob, and you approve the measured drawing. Once the drawing is approved, we confirm the installation date.

Walls, base units and cut-outs must be finalised before the measurements are passed on. Small discrepancies become visible once the stone is in place.

Timeline step by step

How the steps work once the kitchen is ready to be measured.

Step 1: Book the measurement

When the project is ready, normally once the deposit has been paid, you book the measurement time yourself in zones 1 and 2. In zone 3 we suggest times. The base units must be plumb and level, and the old worktop must have been removed. The article From quote to order shows the whole journey.

Step 2: Check measurement on site

We measure, check levels, position the cut-outs and review the edge profiles. You receive a drawing to approve.

Step 3: Production

Production starts once you have approved the drawing. The worktop is normally installed within 8–15 working days from the approved drawing.

Step 4: Delivery and installation

The installation is booked once the worktop is ready in the warehouse, the final payment has been made and any sink that is to be fitted is on site. Our installation team carries in and installs the worktops, then seals the joints.

What we go through at the measurement

The most important checks on site before we fix the drawing.

Level and fixing

Base units plumb, level and fixed in place. We flag anything that needs adjusting before production. See the check measurement checklist for how to prepare.

Cut-outs

Positions of the sink, hob and holes. We verify the models and mounting methods.

Edge profiles and joints

We mark the visible edges, joint positions and any splashback. You see everything on the drawing before you approve it.

Delivery window

We confirm the installation date after the measurement.

If you have bought the sink, hob or tap elsewhere, we need the maker’s installation drawing for the check measurement. Never change the base units after the drawing has been approved.

Frequently asked questions

What happens at the check measurement?

We measure the kitchen, check the base units and walls, position the sink and hob and go through cut-outs and edge profiles.

When do I get a confirmed delivery date?

Once the drawing is approved, we confirm the installation date. Production starts once you have approved the drawing.

Which documents do I approve?

After the check measurement you receive the drawing with the final measurements to approve. Once you have approved it, production starts.

How long does it take after the check measurement?

The normal lead time is 8–15 working days from the approved drawing, depending on the material, cut-outs and logistics.