Clearances and cut-out
Follow the hob manual to avoid cracks and heat damage.
Heat and movement affect the stone around the hob, dishwasher and wall junctions. Decide on protection and positioning before installation.
Minimum clearances
Often at least 50 mm to the front edge and 50–60 mm to the back wall or splashback; Caesarstone requires at least 65 mm to a splashback. A corner radius as the manual states, at least 10 mm on Caesarstone and Dekton. Keep at least 100–150 mm between a cut-out and a joint.
Fit
Dry-fit before applying silicone. Check that there is room for the hob’s drilling and ventilation channels. Leave an expansion gap against the wall and seal with neutral-cure silicone.
Electrical safety
An electrician must make the connection.
Plan the electrics
Put the power rating and phase (single-phase or three-phase) on the drawing. Make sure the junction box and the cabling fit without pressing against the stone or the cabinets.
Heat and fire protection
Fit heat-barrier tape around the oven and hob units as the installation routine requires. A flexible joint against the wall or splashback protects against cracking when the temperature changes.
Checklist before installation
A quick check so that the hob can be dropped into place without risk.
Dimensions and template
Send the PDF template and dimensions to the factory. Check that the cut-out allows for the radius and the safety clearances the manual requires.
Electrical plan
Book an electrician and share the power and current rating, the connection type and the position of the junction box. Make sure the cables do not have to be bent sharply under the stone.
Protection
Put heat-barrier tape around the cut-out and check that the silicone is neutral-cure. Keep the manual and photos of the installation for the warranty.
Frequently asked questions
Why don't you install the hob?
Electrical safety requires an authorised electrician. Hobs must be connected according to local regulations, and a faulty connection can damage both the hob and the stone.
What clearances apply around the hob?
Typical manual requirements: at least 50 mm to the front edge and 50–60 mm to the back wall or splashback; Caesarstone requires at least 65 mm from the hob cut-out to a splashback. Rounded corners in the cut-out reduce the risk of cracks.
What does the electrician need to know?
The power and current rating, the type of connection (single-phase or three-phase) and space for the junction box. Put this on the drawing so that the hob fits.
How do I protect the edge from heat?
Use heat-barrier tape around the oven and hob. Leave a gap against the wall and use neutral-cure silicone, not an acid-based sealant.