The right base gives the right result. A skew of 1 mm in the base units produces gaps of tens of mm at the worktop. We need to see the whole base, because hidden unevenness under an old worktop leads to expensive surprises. And if drawings, accessories and a clear carrying route are ready at the visit, we can finalise everything in one visit.
The measurements must reflect the kitchen as it stands. Walls, base units and cut-outs must be finalised before the measurements are passed on. Small discrepancies become visible once the stone is in place.
How to prepare the kitchen
Five steps that save you an extra visit. Everything should be ready before we arrive with the measuring equipment.
Step 1: Install and adjust the base units
Loose units give the wrong measurements, and an extra visit. Pay special attention to corners where several units meet.
- Fixed to the wall and floor
- Plumb and level (check with a spirit level)
- Corners and joints in an even line
Step 2: Remove the old worktop
We need to see the whole base to judge the support points and take exact measurements. Hidden unevenness leads to expensive surprises.
- Old worktop removed
- Surface free of adhesive and dirt
- Support points visible and accessible
Step 3: Clear the surfaces and the carrying route
The measuring equipment and the finished worktop must be able to come in without obstacles. Appliances that stick up affect the measurements.
- Worktop area completely clear
- Appliances in their final position
- A clear route from the door to the kitchen
Step 4: Decide on overhangs, supports and electrics
These details go straight into the drawing. Without them we cannot fix the measurements.
- Overhang and any seating depth
- Brackets or braces where needed
- Sockets, switches and splashback
Step 5: Have the installation drawings ready
Bought the sink, hob or tap elsewhere? Then we need the maker’s technical drawing for the right cut-out.
- Model-specific installation drawings
- Especially important for IKEA purchases: look for them actively
- Any other cut-outs specified
A correct check measurement gives a worktop that fits perfectly first time.
What we fix at the check measurement
As well as exact measurements, we need to decide how the worktop will be made. This is what we go through on site.
Joint plan and joints
Where the worktop is split and where the joints go depends on the shape of the room and the stone’s veining. We optimise for both durability and looks.
Sink mounting method
Undermount, flush-mounted or inset: the mounting method decides the size of the cut-out and the edge profile. We fix the model and method on site.
Edge profile and finish
Straight, bevelled or rounded edge: the choice affects both the feel and the price. We show examples on site so you can feel the difference.
Final drawing
Everything comes together in a CAD drawing that you approve before production starts. Nothing changes without your OK.
If you need to rebook
Get in touch as soon as possible if something is not ready. We will help you find the next available time for the check measurement.
Frequently asked questions
Do the base units have to be fully installed before the check measurement?
Yes. Loose or uneven units mean the measurements will not be right, and then we have to come back after they have been adjusted, which costs extra time and money.
Can you measure if the old worktop is still in place?
No. The worktop hides the base and any unevenness. We need to see the whole surface to judge the support points and take exact measurements.
What happens if something is not ready at the check measurement?
We may have to rebook the visit. That extends the delivery time and comes with a rebooking charge.
Do you need to know about overhangs, supports, splashbacks and sockets at the check measurement?
Yes. Those details go straight into the drawing. Without them we cannot fix the measurements and need a follow-up visit.
Where do I find installation drawings if I bought the sink or hob elsewhere?
Contact the maker or search their website; the model number is usually enough. Note: IKEA rarely includes installation drawings, so look for them actively before our visit.