How the order is placed
When the project is ready to be ordered, the sink and tap go out as a separate order to the supplier and are linked to your project number.
From acceptance to order
We place the order when the project is ready to be ordered. It then goes onto our purchasing list and gets a traceable order reference.
Order reference
You get a code such as 25453 (year 25, week 45, day 3) for the planned dispatch. We update you if anything changes and tell you about back-orders.
Delivery
Usually 1–3 weeks, depending on stock. Delivered with the worktop or separately, with tracking or a notice by email or text message.
What to send us
The right information means the cut-outs and the delivery are right first time.
Product link or number
Send a link or the item number and the mounting type (undermount, flush-mounted or inset). We order exactly that variant and keep the manual and cut-out guide.
Surface and colour
Mainly applies to Silgranit and composite sinks. Choose a colour that matches the worktop; we double-check with you before ordering so that the right shade is ordered.
Cut-outs
The sink is the detail that needs the most precision: its position, radii, tap holes and drainage must work together. The cut-outs must be finalised before manufacturing starts. The sink cut-out follows the supplier’s guide. The position of the tap is written on the drawing. We do not start cutting until we have complete information and your confirmation.
Step by step
- Choose the model: choose the sink and tap and the mounting type (undermount, flush-mounted or inset). Send a product link or item number.
- The order is triggered: when the project is ready to be ordered, we order the extras from the supplier. You get an order reference.
- Confirmation: you get a confirmation with the planned dispatch date (year/week/day code). We update you if anything changes.
- Delivery: delivered with the worktop or separately, depending on the model. Tracking or a notice is sent when it is dispatched.
Frequently asked questions
When do we place the order?
We order the sink and tap from the supplier when the project is ready to be ordered, and link the order to your project.
Do I get an order confirmation?
Yes. A reference with year/week/day (for example 25453 = year 25, week 45, day 3) shows the planned dispatch.
How long is the lead time?
Usually 1–3 weeks, depending on the model and stock. We let you know if the product is back-ordered.
Who keeps me updated on the delivery?
You get tracking or a delivery notice from us when the order is dispatched. If you have questions, raise a case and we will answer.