Black Week Up to 36% off selected stones! Up to 75% off selected sinks and free check measurement in November See the offers
Stenskivor.se

Delivery and logistics

Drawing requirements for stone kitchens

Everything the drawing for stone worktops must show: basic dimensions, centre lines for the sink and hob, hole types and edge profile. Fill this in and production and installation get it right first time.

Basic dimensions and overhang

Start with the total dimensions and the overhang on each side.

The measurements must reflect the kitchen as installed. Walls, cabinets and cut-outs must be finalised before the measurements are passed on. Small discrepancies become visible once the stone is in place.

Total dimensions

Give the length and depth in mm for every piece. If a splashback is included, give its height and length. Note whether the walls are out of plumb and whether grooving or grinding is needed to follow the wall.

Overhang

Write down the overhang at the front, back and sides. For a breakfast bar, give the seating depth and say whether brackets or legs will be fitted. Include the STO overhang requirements for each material.

Centre lines and holes

The right coordinates make the cut-outs fit exactly.

Centre of the sink and hob

Mark the centre line of the sink and hob, with the distance from the front edge and the side wall. Write the model name and whether the sink is undermounted, flush-mounted or top-mounted.

Holes and diameters

List the holes: tap, soap pump, electrical, pop-up. Give the diameter and the position in mm from the front or back edge and the centre. Attach the product sheet when the diameter differs from the standard.

Edges and joints

Write it clearly for each side so that the factory gets it right.

Edge profile

Straight chamfer, T-profile, mitre or another profile for each visible edge. If the profiles differ, mark each side and height clearly.

Joint position

Place joints away from cut-outs. Mark the direction and leave room for lifting. Draw where the sealant joint meets the wall.

Gap to the walls

Leave a gap for sealant and expansion according to the material’s manual (Dekton, quartz, natural stone). Note this on the drawing so the installation team knows how much to seal.

Frequently asked questions

Which dimensions must be included?

Total width and depth, the centre of the sink and hob, distances to the edge, overhang, splashback and joint positions. All dimensions must be given in mm.

How do I specify holes?

Mark the type (tap, soap pump, electrical), the diameter and the position relative to the centre lines. Use a template or the product sheet for anything special.

How is the edge profile marked?

Write the edge profile for each visible side (for example straight chamfer, T-profile or mitre). If the profiles differ, specify the profile for each side.

Do joints need to be shown?

Yes. Place joints as far from cut-outs as possible. Mark the exact joint lines and the access for lifting during installation.

Related articles

4.5 out of 5 on Reco (502 reviews)