The quality of the installation shows in straight lines. Once the worktop is in place, the support, wall clearances, cut-outs and joints are immediately visible. Complete the preparation before installation begins, whether you fit it yourself or have it installed.
Tools and materials
Have everything ready before the lift.
Measure and adjust
A spirit level, a tape measure marked in millimetres and a pencil. Wedges or shims for fine adjustment of the sink and the worktop.
Sealing and protection
Neutral silicone, a caulking gun, masking tape and cloths. Heat-barrier tape by the oven and dishwasher to protect the edge. Read more in the article on heat protection by the dishwasher and oven.
Lifting
At least 2–3 people and strong lifting straps for heavy worktops. Avoid suction cups on porous surfaces unless they have passed an approved test.
Installation step by step
Follow this order to avoid cracks and leaking joints.
1. Prepare the base
Check the cabinets for loose screws and make sure everything is plumb and level. Fit braces or brackets where the overhang requires them.
2. Dry fit
Lift the worktop into place without silicone. Check the joint gap to the wall and that the sink and hob positions are right.
3. Shim the sink
Put plastic or rubber wedges under the sink to reinforce it before the silicone goes on, so no stresses build up. Read more in the article on sink mounting types.
4. Silicone and joints
Apply neutral silicone under the worktop where needed and around the sink and splashback. Run the bead at an even speed and wipe off the excess with a damp cloth. Leave an expansion gap against the walls.
5. Final check
Check the joints and the overhang, and that the worktop sits flat. Wait until the silicone has cured before putting heavy loads on it.
Safety and warranties
It is important that qualified installers do the heating and electrical work and that the worktop is handled correctly.
Electrics and heat
Have a qualified electrician connect the hob, the oven and any heating cable. Insulate the edge against heat from the oven and dishwasher.
Spills and cleaning
Wipe away silicone residue and dust straight after installation. Avoid strong chemicals until the joints have fully cured. There are tips in the article on cleaning after installation.
Lifting and storage
Store large worktops upright with edge protection. Avoid point loads on the thin sections around the sink and other cut-outs.
Always have an authorised electrician connect the hob and the oven. Heating and electrical work done by someone without authorisation can affect both the warranty and safety.
Frequently asked questions
Can I install a stone worktop myself?
Yes, but you need help with lifting, level cabinets and the right tools. Because of the weight, at least 2–3 people are needed to lift a normal worktop.
Which tools do I need?
A spirit level, wedges or shims, a caulking gun with neutral silicone, heat-protection tape, a tool for fitting the tap, soft cloths and a drill driver for braces and brackets.
How do I seal around the sink and hob?
Use neutral silicone around the sink and along the edge, not acid-cure building silicone. Run the bead continuously and wipe off any excess straight away.
What about heat and electrics?
Leave a gap against the wall for expansion, and have heating and electrical work done by an authorised professional. Use heat protection under the oven or hob as the manual specifies.