When you measure yourself, we work from your drawing. Here you can see what we require, how we double-check the information and when we recommend a check measurement instead.

Measuring yourself is demanding. We need a complete drawing with measurements, centre points for the sink and hob, holes and edge profiles. We ask follow-up questions, may ask for photos and flag any risks; if anything is unclear, we suggest a measurement. When you skip the check measurement, you are responsible for the measurements, and we make the worktop exactly to your drawing.

Walls, base units and cut-outs must be finalised before the measurements are passed on. Small discrepancies become visible once the stone is in place.

How we ensure quality without measuring on site

The steps we go through before we start production.

Review: a complete drawing

We check the measurements, centre points, hole positions and edge profiles. If anything is missing, we ask you to add it.

Models and mounting methods: verify the products

We ask for the model names of the sink, hob and accessories and how they are to be fitted, including flush mounting or undermounting. A flush-mounted hob is not possible in Caesarstone.

Sign-off: a drawing to approve

We send you the drawing to sign. Production starts only once the drawing has been approved.

When we advise against it: safety before speed

With tight tolerances, angles, large joints or anything unclear, we recommend a check measurement and pause the order if the measurements are not sufficient.

Who is responsible for what

Be clear about what you are responsible for and what we take care of.

Your responsibility

A correct drawing, models, mounting methods and base units that are plumb and level. Adjustments after delivery may be needed if the measurements are off.

Our responsibility

Production according to the approved drawing, material quality, machining and safe delivery to the agreed place at the agreed time.

Frequently asked questions

When can I choose delivery without check measurement?

When you have a complete drawing with exact measurements, centre points for the sink and hob, hole positions and edge profiles, and the base units are plumb and level.

When do you say no?

If the drawing lacks measurements or models, or if the kitchen has angles, curves, large joints or recesses that need measuring on site for tight tolerances.

Who is responsible for the measurements?

When you choose not to have a check measurement, you are responsible for the measurements. We deliver according to the drawing you approve.

How do we reduce the risk of mistakes?

We review the drawing, ask follow-up questions and may ask for extra photos or video. At the slightest doubt we recommend a check measurement.